Skip to content
HOME > CASE STUDIES > ENERGY/UTILITIES > INTEGRATED PUBLIC POWER UTILITY

Case Study: Energy/Utilities

Integrated Public Power Utility

Conserving Time and Resources by Upgrading the Purchase Requisition Creation Process

For inexperienced employees, the client’s purchase requisition (PRs) creation process was unnecessarily challenging, requiring time-consuming training and consuming valuable resources. Mindset’s first step in designing a better solution was to conduct collaborative and interactive sessions with stakeholders and gain a detailed understanding of the current process. The Mindset team then created specific personas of roles involved in the PR creation process and developed prototypes of the proposed solution. The result was a new PR creation system that streamlined the process, removed redundant steps, and eliminated training completely.

Reduced
required steps
Increased
efficiency
Improved
resource utilization

Related content

Future-Ready Integrations: How Lucid Motors Migrated to SAP Integration Suite on Cloud Foundry

Future-Ready Integrations: How Lucid Motors Migrated to SAP Integration Suite on Cloud Foundry

May 8, 2025

At Mindset, we center everything we do on the user experience—making people the heart of every SAP solution we build.…

Read Post
Exploring the capabilities of ChatGPT in SAP Ecosystem

Exploring the capabilities of ChatGPT in SAP Ecosystem

August 19, 2023

The blend of AI into ERP is going wild these days, as organizations are looking for ways to enhance productivity,…

Read Post
Back To Top