Skip to content
HOME > CASE STUDIES > ENERGY/UTILITIES > INTEGRATED PUBLIC POWER UTILITY

Case Study: Energy/Utilities

Integrated Public Power Utility

Conserving Time and Resources by Upgrading the Purchase Requisition Creation Process

Wind turbines on green hills with winding road, representing sustainable energy and strategic planning

For inexperienced employees, the client’s purchase requisition (PRs) creation process was unnecessarily challenging, requiring time-consuming training and consuming valuable resources. Mindset’s first step in designing a better solution was to conduct collaborative and interactive sessions with stakeholders and gain a detailed understanding of the current process. The Mindset team then created specific personas of roles involved in the PR creation process and developed prototypes of the proposed solution. The result was a new PR creation system that streamlined the process, removed redundant steps, and eliminated training completely.

SAP purchase requisition creation interface showing plant selection, PO options, and vendor details
SAP purchase requisition approval interface showing requisition details and workflow status
Reduced
required steps
Increased
efficiency
Improved
resource utilization

Related content

Two small colorful birds perched on a tree branch in nature

Introduction to FIORI tools – Part 2

June 15, 2021

This blog is the second part of a series of four blogs to introduce FIORI tools. For Part 1, start…

Read Post
Blue sky with white clouds over golden horizon at sunset

Merlin by Mindset

December 4, 2023
by

Determining which SAP Fiori applications work for your business can be frustrating. We get it. It’s complicated when your SAP…

Read Post
Back To Top