Skip to content
HOME > CASE STUDIES > DISTRIBUTION > LARGE ELECTRICAL SUPPLY CONGLOMERATE

Case Study: Distribution

Large Electrical Supply Conglomerate

Modernizing Interfaces to Save Money and Reduce Downtime

Engineer using tablet to monitor solar panel performance and data collection on rooftop installation

A large electrical supply company needed to upgrade their on-premise hardware and modernize their approach to software. Their legacy system had 30 interfaces and their 18 NEO CPI services needed to be migrated to new Cloud Foundry sub-accounts.

In just three months, Mindset migrated existing PI/PO functionality to SAP BTP Integration Suite and successfully completed the 48 identified integrations with almost no downtime. The solution saved money on hardware and upgrade costs and enabled real-time APIs.

Saved
hardware & upgrade costs
Completed
in 3 months
Enabled
real-time APIs

Related content

SAP consultant smiling outdoors with SAP headquarters building visible in background

Travels to Germany: My Visit to the Apphaus Heidelberg, Walldorf, and Design Thinking for Product Strategy

October 4, 2021

With nearly two years since my last international business trip, I decided it was time to get out there and…

Read Post
SAP S/4HANA

Getting to Know: SAP S/4HANA – A Primer

February 23, 2021

This blog is the introductory post of a four part series which will help those interested in understanding SAP S/4HANA. …

Read Post
Colorful lottery balls with numbers being drawn from machine during random selection process

Wellness Challenge at Mindset Consulting

October 22, 2020

Here at Mindset, we’re always looking for new ways to give back to the community and cities we live in!…

Read Post
Back To Top